Projects
Our Projects Delivering Quality Across Every Project
Completed Projects Across UAE
Double Tree By Hilton
Long Gate Bridge
Enix Lawyer Building
Expo 2020
TIARA-UNITED-TOWER
Nctech Building
BURJ VISTA
Food Lab Building
Warehouse Mezzanine Floor & Racking System Installation — Junaid Group, Abu Dhabi
We successfully completed the full installation of a heavy-duty mezzanine floor and multi-level racking system at Junaid Group’s warehouse in Abu Dhabi. Our skilled team handled the complete structural setup — from assembling the steel racking frames and fitting the galvanized metal deck flooring to installing the access staircase with safety railings. The project maximized the warehouse’s vertical storage space, providing a strong, durable, and organized storage solution for the client’s growing inventory needs.
- Heavy-duty steel racking system installation
- Mezzanine floor with galvanized metal deck
- Access staircase with safety handrail fitting
- Full warehouse storage optimization
- Professional welding and structural assembly
Ariston Solar Water Heater Installation — Villa Project, UAE
We successfully completed the installation of an Ariston solar water heating system at a residential villa in UAE. Our certified technicians carried out the full setup on the rooftop — including mounting the flat plate solar collectors, connecting the stainless steel storage tank, and completing all piping and fitting work with precision. The system harnesses the power of the sun to provide a reliable, energy-efficient, and eco-friendly hot water supply for the entire villa.
- Ariston solar water heater system installation
- Flat plate solar collector panel mounting
- Stainless steel tank placement and securing
- Complete pipe fitting and water connection
- Rooftop installation with full safety compliance
Certificates




